|
|
|
|
| LEADER |
00000caa a22000007a 4500 |
| 001 |
16NT09001717 |
| 005 |
20180212114438.0 |
| 008 |
140619m19681973cl ||m rf 0 ||spa|d |
| 952 |
|
|
|0 0
|1 0
|2 udc
|4 0
|6 00282105_B197C_1968
|7 0
|8 CG
|9 5490
|a BC
|b BC
|c ES
|d 2016-09-12
|i 16NT09001717
|l 0
|o 002.821(05) B197c 1968
|p 0000123510332
|r 2016-09-12 00:00:00
|t c.1
|w 2016-09-12
|y PS
|
| 952 |
|
|
|0 0
|1 0
|2 udc
|4 0
|6 00582105_B197C_1968
|7 0
|8 CG
|9 5491
|a BC
|b BC
|c ES
|d 2016-09-12
|i 16NT09001717
|l 0
|o 005.821(05) B197c 1968
|p 0000123510349
|r 2016-09-12 00:00:00
|t c.2
|w 2016-09-12
|y PS
|
| 999 |
|
|
|c 21411
|d 21411
|
| 040 |
|
|
|a Ministerio de Vivienda y Urbanismo
|b spa
|c CEDOC - MINVU
|
| 082 |
0 |
4 |
|a 005.821(05)
|b B197c 1968
|
| 100 |
1 |
|
|a Baltar, Antonio
|9 8219
|
| 245 |
1 |
0 |
|a Control de la ejecución de proyectos por el método del camino crítico (Pert) /
|c Antonio Baltar, ILPES
|
| 260 |
3 |
|
|a Santiago :
|b CEPAL,
|c 1968, reimp. 1973
|
| 300 |
|
|
|a 60 p.
|
| 440 |
|
0 |
|a Cuadernos del ILPES
|v Serie I: Apuntes de Clases
|9 8220
|n N° 4
|
| 505 |
0 |
|
|a Método del camino crítico (CPM) -- Problemas y métodos de la planificación y control de la ejecución de proyectos. Antecedentes -- Conceptos básicos del método del camino crítico -- Representación de una red por la matriz de las duraciones de las actividades -- Cálculo de las magnitudes críticas de la red de actividades -- El sistema PERT -- Relación entre PERT y CPM -- El empleo de computadoras electrónicas en el PERT -- El PERT-Costo -- Una rutina de programación de proyectos para determinar el plazo de ejecución correspondiente al mínimo costo total.
|
| 650 |
1 |
4 |
|a PERT
|9 7543
|
| 650 |
1 |
4 |
|a Control de Proyectos
|9 5324
|
| 650 |
1 |
4 |
|a Evaluación de Proyectos
|9 4575
|
| 710 |
2 |
|
|a Instituto Latinoamericano de Planificación Económica y Social
|9 8056
|
| 942 |
|
|
|2 udc
|c PS
|